The bathroom renovation has started and is in full swing.  Overall things have been going pretty smooth.  I was hoping for more help on demolition weekend but a few people flaked out.  My buddy Mike Branstrom was there and ready to work.  Could not have done it with out Bricks and his bag of tricks.  He got the majority of the walls framed up after we ripped everything out.  We were definitely tired that weekend.  After that things progressed well.  Electrical installed, plumbing installed, new insulation with a vapor barrier.  My dad and Ron got the plumbing for the toilet relocated.  It went pretty good.  I thought we would have had many more issues, but we didn't with that.  It is mounted temporarily for now, but it really helps for all of Darlene's late night bathroom trips.
Most of the drywall went up this weekend.  Ron was busting it out yesterday while I was at work.  Just have to get the tub drain to stop leaking and then it is mud time!  Hoping to get it all done by the end of the month!

Comments

Popular posts from this blog

Rolling in the Deep

So the twins have been sleeping through the night for some time now.  Darlene and I enjoy it a great deal, but this morning.....   Ryan decided to roll over at 4am.  And then proceeded to cry.  Darlene got up with him, rolled him back over and he went back to sleep for an hour.  I got up with him at 5 and there was no way he was going back to sleep.  I really hope this isn't a pattern starting! What can we do about it?? Any ideas?

First Unboxing Video

My First Unboxing Video

Schooled

As many of you know I have been going back to school for my IT-Networking degree from MSTC in Stevens Point.  I am in my 3rd semester.  I have 2 semesters left.  I will be doing another full time semester this next spring.  I did full time last spring and it was rough.  Hopefully it won't kill me like last semester did.  The plan is that I will graduate next December.  There have been some rough spots, but I made it through.  I am looking forward to finishing up this semester and getting started with the next one.  I will hopefully be doing my internship soon and I am excited to get some on the job experience. I am also looking forward to getting done with the semester so that I have more time to do work on the house.  We plan on doing most of the work on the back bedroom the first/second weekend in January, when I am on winter break.  And then the plan is to work on the bathroom over spring break. (the end of March)   The G ...